LEADA are engaged through JN Bentley to support Severn Trent Water to design, manufacture and install a Storm Generator test facility at Strongford WwTW.
The LEADA team were brought into the project in November 2024, to complete the design, manufacture and installation of the following;
- Storm Generator Control Centre
- Portal Building
- Low Voltage Distribution Board
- Building Serviced Distribution Board
- Storm Generator Distribution Board
- Local Control Panel
- Mixer Pump starter
- Storm Generator Mixing Tank
- Mixer pump and pipework
- Level monitoring and control
- Temporary Dosing
- 2-stage Ferric Dosing
- 2-stage test dose (plant-based coagulant)
- Site wide Electrical Installation
- System Test and Commissioning
The client brief and project driver is for test results to be generated from the test facility before the end of March 2025, this gave LEADA 8 weeks from confirmation of design scope to detail design, fabricate and install the entire system on site, this includes the bespoke control panel manufacture and software design – all works completed by our in-house project team.
The system was delivered to site on programme, to allow completion of the electrical installation early March 2025.