Christmas Week!

The final full week leading up to Christmas was quite eventful for our team, as we all participated in First Aid training at Ripon HQ. Just as we thought we could ease into the Christmas period, we found ourselves on a tight schedule to set up a temporary caustic dosing system on one of our […]

We are recruiting!

Following continued success with our customers and a significant customer return in additional workload, we are actively seeing skilled and motivated individuals to join our team in a variety of positions. If you are contemplating a career change or looking for new opportunities, LEADA could be the ideal next step in your professional journey. At […]

ISO Accreditation

This week our integrated management system was put through its paces during our annual review and audit. The fully integrated management and control procedures were developed in 2018 and have been accredited to ISO 9001, ISO 45001, and ISO 14001 since that date.  What is ISO accreditation? ISO accreditation is a certification process demonstrating an […]

Installation of Solar PV at Ripon HQ

The team at Leada Engineering have been busy installing the next Phase of our Solar PV and Battery Storage System at Leada Court, Ripon. On completion in 2025, the system has been designed to make LEADA Head office, stores, and workshop energy negative, which also includes power to a fleet of 4nr EV’s and our […]

YWS Ainderby Site – Flowmeter Installation

Leada were contacted by Yorkshire Water Services under our EICAT Framework Contract to undertake a flowmeter installation on a disinfection system at one of their borehole sites. During the onsite review, it became apparent that the requirement was for flow proportional control on the disinfection system (compliance requirement).  Given the complexities of the site, the […]

Training & Development

LEADA are committed to the training and development of our team. Continued professional development is essential to motivate colleagues and help them achieve their ambitions… It is highly rewarding too! The reviews and employee one-to-ones allow employees to provide feedback and talk to us about their development so we can understand and open up goals on […]

Otley STW – Our Newest Site

LEADA have recently started a new project working with Yorkshire Water Services, to upgrade their STW at Otley in Wharfedale, West Yorkshire. The initial stage of the project includes site-wide electrical, ducting, and ICA investigation work. Once design work has been completed by LEADA, The main body of work on this project will include:  Site […]

Sladen Valley WTW

Last week Dave and Darrell from LEADA visited Sladen Valley WTW. A Yorkshire Water site we have been involved with to undertake a pump service of the dosing and dilution pumps. The system is for the final disinfection of drinking water for Yorkshire Water. The system was an off-site built kiosk dosing system, comprising of […]

Our Latest Recruit! Welcome Darrel

Darrel is the latest recruit to have joined our LEADA team. Darrel is a qualified mechanical engineer and electrically qualified, with over 20 years of expertise in water, wastewater, and mine water treatment. He is an experienced project engineer and MEICA Project Manager having worked on projects for most of the UK Water Companies. Projects […]

Welcome to LEADA Engineering News

Leada staff

First and foremost, thank you for visiting our brand-new website, what do you think? We’ve been working on this for the past few months to show everyone what we’re all about! It’s been a mix of photography sessions at Ripon HQ, rebranding to our simple new logo, and getting it added everywhere. So here we […]

1,000 Litre IBC Dosing Rig

1000 Litre IBC Dosing Rig, include:

  • Standard Leada Components (other options available)
    • Grundfos DDA with FCM Pumps – 7.5ltr/hr, 60ltr/hr, 120ltr/hr, 200ltr/hr options
    • GF pipework and valves
    • Prochem loading valves
    • Self contained unit
    • Dual contained flexible dosing line
  • Bespoke design and fabrication available if required
  • Ideal for temporary dosing
  • Installation service available
  • Can be mobilized quickly to site
  • Pre-wired to externally mounted marshalling box
  • Polypropylene or PVC options
  • Fully weatherproof

Containerised Dosing System

Multipoint Dosing

Container Housed Dosing Rigs include:

  • Standard Leada Components (other options available)
    • Dosing Rig, Housing Grundfos DDA with FCM Pumps
    • 7.5ltr/hr, 60ltr/hr, 120ltr/hr options
    • GF pipework and valves
    • Prochem loading valves
    • Prochem pulsation dampers
    • IFM Flow switches
    • IFM Level switches
    • Calibration Pots
  • Bespoke design and fabrication available
  • Complete segregation of dosing compartments
  • External safe isolation of inlet valve
  • Pre-wired to externally mounted marshalling box
  • Polypropylene or PVC options
  • Over-pressure return to calibration pot
  • Fully factory tested with witness test available if required
  • Installation service available

Fiber Optic Enclosure

Duty-duty, dual redundant uninterruptable power supply

The Fiber Optic Breakout Enclosure (FOBE) is designed to supply resilient power to the managed Ethernet switch of a site wide communications network, including:

  • 2 x 16 core fibre optic cable connections in a dual redundant ring via patch panels and leads,
  • Ethernet Managed switch with dual 24V DC power inputs
  • Duty-Duty Dual redundant 230V / 24V DC power supply units,
  • Power supply load management that ensures equal power supply loading in normal use,
  • 24V DC VRLA battery powered UPS unit providing backup in the event of mains failure,
  • Ethernet managed switch dual 24V DC power inputs so that failure of any one item of equipment does not affect the continuity of the network communications, and
  • Hardwired contacts for remote monitoring of Network Interface Module status signals:
  • UPS System Fault
  • Redundant 24V DC power supply units Healthy
  • Ethernet Switch Fault

Chemical Dosing Rig

Multipoint Dosing

Multipoint Dosing Rigs include:

  • Standard Leada Components (other options available)
    • Grundfos DDA with FCM Pumps – 7.5ltr/hr, 60ltr/hr, 120ltr/hr, 200ltr/hr options
    • GF pipework and valves
    • Prochem loading valves
    • Prochem pulsation dampers
    • IFM Flow switches
    • IFM Level switches
    • Calibration Pots
  • Bespoke design and fabrication available if required
  • Complete segregation of dosing compartments
  • External safe isolation of inlet valve
  • Pre-wired to externally mounted marshalling box
  • Polypropylene or PVC options
  • Over-pressure return to calibration pot (vent relief to tanks)
  • Fully factory tested with witness test available if required

Chemical Dosing Rig

Dilution System

Dilution Rigs include:

  • Standard Leada Components (other options available)
    • Grundfos DDA with FCM Pumps – 7.5ltr/hr, 60ltr/hr, 120ltr/hr, 200ltr/hr options
    • GF pipework and valves
    • Prochem loading valves
    • Prochem pulsation dampers
    • IFM Flow switches
    • IFM Level switches
    • Calibration Pots
  • Bespoke design and fabrication available if required
  • Complete segregation of dosing compartments
  • External safe isolation of inlet valve
  • Pre-wired to externally mounted marshalling box
  • Polypropylene or PVC options
  • Over-pressure return to calibration pot (vent relief to tanks)
  • Fully factory tested with witness test available if required

Temporary Dosing Systems

25 Ltr Carboy Dosing

25 Ltr Carboy Dosing System, designed for:

  • Temporary works applications
  • Chlorination / De-Chlorination
  • Emergency Dosing

Summary and options:

  • 240v / 110v options
  • Prominent or Grundfos Pump Mounting Options
  • Splash screen covers (not shown)
  • Can be supplied with suction and delivery hoses
  • Hire options available
  • Chemical compatibility options available

Chemical Dosing Kiosk Solution

Dilution System

Chemical Dosing Kiosk Solution

Duty – Standby Dosing Configuration

Chemical Dosing Rig

Duty - Standby

Duty - Standby Dosing Rigs include:

  • Standard Leada Components (other options available)
    • Grundfos DDA with FCM Pumps – 7.5ltr/hr, 60ltr/hr, 120ltr/hr, 200ltr/hr options
    • GF pipework and valves
    • Prochem loading valves
    • Prochem pulsation dampers
    • IFM Flow switches
    • IFM Level switches
    • Calibration Pots
  • Bespoke design and fabrication available if required
  • Complete segregation of dosing compartments
  • External safe isolation of inlet valve
  • Pre-wired to externally mounted marshalling box
  • Polypropylene or PVC options
  • Over-pressure return to calibration pot (vent relief to tanks)
  • Fully factory tested with witness test available if required