Keldgate WTW – Leada Principal Contractor – Yorkshire Water

This week LEADA started work at Keldgate WTW for Yorkshire Water. The scheme involves the installation, testing and commissioning of a new site wide Fiber Network Installation and hardwired telemetry system. We had to extend the duct network to tie in the existing network in order to finish the fibre network ring and ensure a completely secure […]
ISO Accreditation

This week our integrated management system was put through its paces during our annual review and audit. The fully integrated management and control procedures were developed in 2018 and have been accredited to ISO 9001, ISO 45001, and ISO 14001 since that date. What is ISO accreditation? ISO accreditation is a certification process demonstrating an […]
YWS Ainderby Site – Flowmeter Installation

Leada were contacted by Yorkshire Water Services under our EICAT Framework Contract to undertake a flowmeter installation on a disinfection system at one of their borehole sites. During the onsite review, it became apparent that the requirement was for flow proportional control on the disinfection system (compliance requirement). Given the complexities of the site, the […]